Works Update – 13 February 2023

15-02-2023

The following are roadworks commenced, completed or continued in the week ending 10 February, and those scheduled for the week ending 17 February 2023.

Week ending 10 February 2023

Construction Crew

Collector Rd – Replaced 650 mm culvert (storm restoration).
Collector Rd – Maintenance Grading completed.
Gunning Showground – Grading of trotting track and internal roads.
Warrataw Street Gunning – Maintenance gravel patching & grade.
MR241 – Commenced maintenance grading.
Dalton/Jerrawa Rd Rehab – Setup and commencement of roadside clearing.
Mulgowrie Road – Gravelling and trimming up for seal
Reids Flat Road, Boiler Hill – Rehab for seal

Maintenance Grading Crew

Bevendale Rd – Maintenance grade

Maintenance Crew

Collector Rd – Drainage
Collector Rd – Traffic control for Truck jack knife on Collector Hill
Collector/Breadalbane Rd – Tar Patching
Walsh’s Rd – Causeway repairs
Collector Rd – Erect “Dip” sign & tar patching

Drainage

Reids Flat Road, Boiler Hill – Installing pipes tree removal and reshaping drains

Contractors

Towrang Road – Coopers Earthmoving doing heavy patch repairs Towrang Road

Proposed activities for week ending 17 February 2023

Construction Crew

Jerrawa Rd Rehab – Culvert replacement
Bush’s Pit Rd – Reformation
Coolalie Rd, Oolong Rd, Armour’s Rd – Maintenance Grading
Mulgowrie Road – Gravelling and trimming up for seal
Reids Flat Road, Boiler Hill – Rehab for seal

Maintenance Grading Crew

Jerrara Rd, Abbey Collins’ Road – Maintenance grading

Maintenance Crew

MR52 North, Collector Road – Tar Patching
Collector Road – Drainage maintenance

Drainage

Reids Flat Road, Boiler Hill – Installing pipes tree removal and reshaping drains

Concrete/Bridge Gang

Grabine Road, Sandy Creek – Installing box culverts